2023 <span class ="tr_" id="tr_1" data-source="" data-orig="Aluminum Facade Panels Projct designs">Aluminum Facade Panels Projct designs</span> - Alumida

Ko nga Paewhiri Matapihi Aluminium

Tiwhikete

ISO 9001:2015 | SGS tiwhikete | He mea nui ki nga Tirotiro Kounga

Aluminum Facade Panels Manufacturing Capabilities

Capability: 1,200,000 square meters/Year
Rauemi: 1100H24 / 1060H24 / 3003H24 / 5005H24
Te matotoru: 1.0 ~ 5.0mm are all available
Rahi: 600*600 / 600*1200mm / 1220*2440mm(standard size)/ customized size
Suraface: Roller coating / PVDF paninga / Te paninga paura
Tolerances: Typically, Alumideas can maintain machining thickness tolerance of ±0.2mm and length or width tolerance of ±2mm.

How To Install Aluminum Facade Panels?

About how to install aluminum facade panels, as a facade panel manufacturer, we will offer fully guideline to our customers, here’s the installation short introduction:

1. Use vertical transportation equipment such as elevators to transport aluminum plates and accessories to each construction node.

2. The whole aluminum plate is connected with the keel through the surrounding aluminum corner codes (brackets) and fixed on the keel.

3. Fixing method: If it is built-in seamless splicing, drill at the corresponding position on the keel, and then riveted with a flat head (countersunk head) aluminum rivet; If it is seam splicing, use steel drill tail screws (also known as flange screws or phoenix screws) to directly drill into the keel through the holes of the aluminum corner code to stabilize the aluminum plate, but pay attention to control the tightness of the drill bit.

4. When trial assembly, pay attention to the installation accuracy, and adjust the aluminum plate before fastening.

5. When installing, the aluminum plate should be installed on the wall according to its serial number.

aluminum panel installation method drawing

Aluminum wall panel installation method drawing

6. The installation of aluminum plates always starts from the front, large area, and corner parts, and is installed from top to bottom.

7. The connection between the aluminum plate and the keel must meet the requirements of the drawings, it must be firm and stable, and bolts must be installed.

Tikina To Otinga Konumohe Wharangi Motuhake

Ka awhina matou ki a koe ki te karo i nga mahanga me te whakarato ki a koe he otinga roa me te utu whai hua i te waa me te putea.

Tirohia te Putumōhio Katoa

Ko te Whakawhitinga Korero Tere ka awhina i a maatau ki te mahi pai atu ki a koe

Alumideas Catalog

Tonoa He Korero Tere

Tikina he korero tere mai i a maatau kaitohutohu ngaio.

Ka whakapā atu matou ki a koe i roto 1 ra mahi, kia aro mai ki te imeera me te kumara “@alumideas.com”.